A demolition contractor can ensure structural alterations, soft stripping and minor demolition works are carried out in accordance with best practise and ensure safety throughout the process.
Where temporary works are required, the installation process needs to be managed and supervised to ensure the engineer's tolerances are adhered to and maintained.
Our team can advise on the require temporary works system and assist in procuring the right equipment, through to install and inspection for the duration of the project.
Where construction design overlaps with the demolition, we can provide a collaborative service to ensure continuation of the programme and incorporate the permanent works into the temporary solutions.
This may be necessary where foundations are exposed to ensure stability of an adjacent structure or to reduce weathering of the excavation.